- Before performing an oil change, lower the front loader onto the ground.
- After an oil change or after working on the hydraulic system, move the front loader carefully to all end positions without a load to remove any air that might have entered
- Allow the machine and components to cool down to under 55 °C before performing maintenance work
- See the front loader Operating Instructions for detailed service instructions and warnings